Geraldton Port Maintenance Works
°ÄÃÅËIJ»ÏñÂÛ̳ was engaged for various structural integrity and maintenance works at the Geraldton Port by Mid West Ports Authority (MWPA) and Marine & Civil.
Our Scope
Berth 4 Substructure Upgrade
°ÄÃÅËIJ»ÏñÂÛ̳ was engaged by MWPA for fabrication and installation of beam work to the underside of Berth 4 at the Geraldton Port.
Berth 3 Concrete Repairs
°ÄÃÅËIJ»ÏñÂÛ̳ was engaged by Marine & Civil to undertake various concrete repairs to the underside of Berth 3 at the Geraldton Port. The scope included:
- Supply of scaffolding access to the underside of Berth 3 to facilitate concrete repairs
- Structural integrity repairs to structural steel on the underside of the Berth, including platework and blast and paint
Fishing Boat Harbour Structural Integrity Works
°ÄÃÅËIJ»ÏñÂÛ̳ was engaged by MWPA to complete various structural integrity works at the fishing boat harbour, including structural repairs, blasting and painting.
Berth 5 Fuel Piping & Walkway Removal
°ÄÃÅËIJ»ÏñÂÛ̳ was engaged by Marine & Civil for removal of redundant fuel piping and walkway underneath Cargo Berth 5 at the Geraldton Port.